|
Album: BANKS POOL
this is my personal pool built from ground up. it has 12 tons of rock and black pebble tec
Date: 04/14/2010
Size: 21 items
Views: 376
|
Album: Ajouz Residence
complete reno with custom inlays. glass tile in spa and on bar seats. rebuilt granite spillway. remodeled bar top and interior finish in caribbean blue pebble tec
Date: 08/20/2009
Size: 2 items
(41 items total)
Views: 229
|
Album: Betances Residence
Complete renovation with rock tile line. Travertine coping and deck. Spa area done in all rock. Spa spillway was filled and opened 5 feet wider. Pool finish done in Caribbean Blue.
Date: 11/06/2009
Size: 2 items
(37 items total)
Views: 256
|
|
Album: Buck Residence
Complete renovation with new tile. Flagstone deck and white pebble tec pool finish.
Date: 11/06/2009
Size: 68 items
Views: 254
|
Album: Austria Residence
Date: 11/02/2009
Size: 19 items
Views: 186
|
Album: Disney Contemporary Hotel
This is the Contemporary Hotel at Disney. We installed over 3000 feet of tile on this renovation.
Date: 11/10/2009
Size: 26 items
Views: 170
|
|
Album: Disney Old Key West Resort
This is one of the Disney Old Key West Resort pools. This pool required new inner and outer beam rebuild and top beam rebuild with a total of 1700 feet of tile
Date: 11/10/2009
Size: 12 items
Views: 134
|
this pool got remodel coping with new pavers and a finish
Date: 11/10/2009
Size: 7 items
Views: 150
|
Album: Curry Ford Rock Job
We built a ledge and stacked rock and set new coping
Date: 11/10/2009
Size: 7 items
Views: 139
|
|
Album: Hurst Residence
We added a spa to the deep end of the pool covered with rock and a rock spillway. The tile line and coping was also done in rock. We also added seats in the deep and shallow end and finished it off with Carribean Blue pebble tec
Date: 11/10/2009
Size: 7 items
Views: 125
|
Album: Indian Hills Job
This pool got travertine coping and a spanish style tile to match the style of the house
Date: 11/10/2009
Size: 11 items
Views: 150
|
this pool had the walls rebuilt. new glass tile and remodel coping with a new finish
Date: 11/10/2009
Size: 7 items
Views: 121
|
|
this remodel was new tile while keeping the old finish, filling in the planters, texturing and repainting the deck
Date: 11/10/2009
Size: 3 items
(25 items total)
Views: 95
|
this pool got new tile and finish and new textured deck
Date: 11/10/2009
Size: 12 items
Views: 134
|
this pool got 2 rows of tile while retaining the old finish. finished off with an acid wash
Date: 11/10/2009
Size: 9 items
Views: 126
|
|
Album: Scott Nemiro's Pool
We had to custom build and pour a new footer to accept the new Thin-Deck coping. Also replaced the tile and prepped and bond coated pool for new finish.
Date: 08/17/2009
Size: 14 items
Views: 162
|
Album: schoolfield properties
Date: 04/20/2010
Size: 14 items
Views: 95
|
Album: lowry residence
this pool had a new beam replacement with new tile,coping,pavers and carribean blue pebble tec
Date: 04/20/2010
Size: 18 items
Views: 143
|
|
Album: turner pool
we raised the spa 6 inches and widened the spillway with stacked rock. rock on the steps and swimout. new tile and white pearl pebble tec. new texture deck and paint
Date: 07/04/2010
Size: 26 items
Views: 95
|
Date: 08/24/2010
Size: 13 items
Views: 86
|
Album: turner
Date: 08/24/2010
Size: 31 items
Views: 104
|
|
Album: reid
Date: 08/24/2010
Size: 24 items
Views: 105
|
Album: lamb residence
Date: 08/24/2010
Size: 22 items
Views: 106
|
Album: deputy
Date: 08/24/2010
Size: 15 items
Views: 105
|
|
Album: koval
Date: 05/13/2011
Size: 5 items
Views: 45
|
Album: scrima
Date: 05/13/2011
Size: 7 items
Views: 74
|
Album: mallard circle
Date: 05/17/2011
Size: 21 items
Views: 56
|
|
Album: marriot cypress harbour zen spa
Date: 05/17/2011
Size: 18 items
Views: 66
|
Album: mitchell
Date: 05/17/2011
Size: 13 items
Views: 39
|
Album: ob
Date: 05/17/2011
Size: 10 items
Views: 54
|